A similar model from the company that created the prefabricated washroom, Urben Blu | From UrbenBlu.com
In anticipation of the upcoming summer season, Grand Bend is embarking on a project to alleviate long wait times for beachgoers by adding more washroom facilities. Construction on the second facility is slated to commence this month, aiming to address the surge in visitors expected during the warmer months.
The project kicks off with the installation of servicing to support the installation of a prefabricated washroom facility in the municipal lot – with the new amenities slated to be finished by May, just in time for the Summer tourist season.
To minimize disruptions to traffic flow during the construction phase, authorities have assured that Main Street West and Government Road will remain open to two-way traffic at all times. However, intermittent lane closures may be necessary as construction progresses.

The washroom will be installed on this municipal lot
The new facility will be situated between the municipal lot on the North side of Main Street and the beach, aiming to optimize accessibility for beach visitors.
Written by: B. Shakyaver